Energy Saving Systems Network Server Loch Lomond Seaplane Just Cause 3 Plane Lock on

1.Product Specification of the Energy Saving Systems Network Server loch lomond seaplane just cause 3 plane lock on 2.Product Size of the Energy Saving Systems Network Server loch lomond seaplane just cause 3 plane lock on 3.Deliver,Shipping and Serving of the Energy Saving Systems Network...

Send InquiryChat Now

Product Details

1.Product Specification of the Energy Saving Systems Network Server loch lomond seaplane just cause 3 plane lock on

Product Name

Energy Saving Systems Network Server loch lomond seaplane just cause 3 plane lock on

Place of origin

Guangdong,China(Mainland)

Material of cylinder and housing:

Material of lock case, cylinder & inner core: zinc alloy

Material of inner core:

zinc alloy 

Cylinder Size:

L110*W56mm

Weight & measurement:

52*23*21CM  24.4Kg  22.9Kg  0.025CBM

Packing:

1 pc in PE bag, 50 pcs in export carton

Accessories:

2 keys K1034; 1 long screw bolt; 2 hexagonal nuts;
1 rubber gasket

Standard Finish:

Chrome plated

Others:

1. 6 wafers, 400 key changes
2. Key alike can be made on request


2.Product Size of the Energy Saving Systems Network Server loch lomond seaplane just cause 3 plane lock on

2970C文字介绍819.png

 

3.Deliver,Shipping and Serving of the Energy Saving Systems Network Server loch lomond seaplane just cause 3 plane lock on

Packaging Details:

1 pc in PE bag, 50 pcs in export carton

Delivery Detail:

Shipped in 25 days after payment

 

4.FAQ of the Energy Saving Systems Network Server loch lomond seaplane just cause 3 plane lock on

 (1).Q:What is Energy Saving Systems Network Server loch lomond seaplane just cause 3 plane lock on’s MOQ? 
 A:It is depending item,It is 200 pcs ,welcome to inquiry.
 (2).Q:What is the shipping port? 
 A:The shipping port is Guangzhou , Shenzhen or as your requirement.
 (3).Q:What is the Energy Saving Systems Network Server loch lomond seaplane just cause 3 plane lock on’s delivery time?
 A:The delivery time is about  25days after your payment.
 (4).Q:What is the time of making Energy Saving Systems Network Server loch lomond seaplane just cause 3 plane lock on’s sample? 
 A: About 3days
 (5).Q:How about the Energy Saving Systems Network Server loch lomond seaplane just cause 3 plane lock on’s sample? 
 A:We supply sample,but you should pay the sample freight

 

 

 


Inquiry