Capacity Ups Systems Physical and Chemical Equipment Draw Cam and Groove Fittings

Capacity Ups Systems Physical and Chemical Equipment Draw Cam and Groove Fittings

1. Product Specification of the Capacity Ups Systems Physical And Chemical Equipment draw cam and groove fittings 2. Product Size of the Capacity Ups Systems Physical And Chemical Equipment draw cam and groove fittings 3.Deliver,Shipping and Serving of the Capacity Ups Systems Physical And...

Send InquiryChat Now

Product Details

1. Product Specification of the Capacity Ups Systems Physical And Chemical Equipment draw cam and groove fittings

Product Name

Capacity Ups Systems Physical And Chemical Equipment draw cam and groove fittings

Place of origin

Guangdong Province

Material of cylinder and core:

Zinc alloy

Cylinder Size:

D19L20mm,D19L25mm or D19L30mm

Packing:

For D19L20mm, 1 pc in PE bag, 400 pcs in export carton
For D19L25mm, 1 pc in PE bag, 350 pcs in export carton
For D19L30mm, 1 pc in PE bag, 300 pcs in export carton

Accessories:

2 keys K1034; 1 hexagonal nut 19mm A1013; 1 cam plate CO007;
1 fix washer A1011

Weight & measurement:

For D19L20mm, G.W. 26.3 kgs per carton, 0.025 CBM per carton
For D19L25mm, G.W. 25.3 kgs per carton, 0.025 CBM per carton

For D19L30mm, G.W. 24.9 kgs per carton, 0.025 CBM per carton

Standard Finish:

 

Others:

1. 6 wafers, 400 key changes
2. Key alike can be made on request

2. Product Size of the Capacity Ups Systems Physical And Chemical Equipment draw cam and groove fittings

Capacity Ups Systems Physical And Chemical Equipment draw cam and groove fittings .png 

3.Deliver,Shipping and Serving of the Capacity Ups Systems Physical And Chemical Equipment draw cam and groove fittings

Packaging Details:

G.W. 13.5 kgs per carton,
0.025 CBM per carton

Delivery Detail:

Shipped in 25 days after payment

4.FAQ of the Capacity Ups Systems Physical And Chemical Equipment draw cam and groove fittings

(1).Q:What is Capacity Ups Systems Physical And Chemical Equipment draw cam and groove fittings ’ MOQ? 
 A:It is depending item,It is 200 pcs ,welcome to inquiry.
(2).Q:What is the shipping port? 
 A:The shipping port is Guangzhou , Shenzhen or as your requirement.
(3).Q:What is the Capacity Ups Systems Physical And Chemical Equipment draw cam and groove fittings’ delivery time?
 A:The delivery time is about  25days after your payment.
(4).Q:What is the time of making Capacity Ups Systems Physical And Chemical Equipment draw cam and groove fittings ‘ sample? 
 A: About 3days
(5).Q:How about the Capacity Ups Systems Physical And Chemical Equipment draw cam and groove fittings ‘ sample? 
 A:We supply sample,but you should pay the sample freight

Company

Process
1. Factory >> 2. Making the mould >> 3. Zinc alloy mould workshop >> 4. Punching mould workshop >> 5. Zinc alloy die casting workshop >> 6. Vibration machine workshop >> 7. Machining the locks >> 8. Punching machine workshop >> 9. Making the key >> 10. Laser key numbers >> 11. Making the wafer for the lock cylinder >> 12. Install the lock

 

 


Inquiry